INFRASTRUCTURE

OUR MAIN FACILITY

  • Fabrication Facilities
  • Rubber Lining
  • Rubber Moulding
  • Sand Blasting
  • Calendring Facility
  • Facilities in Rubber Lining Area
  • Office (1500sq.ft)

RUBBER SHEETING DIVISION

  • Constructed Area - Around 21,600sq.ft
  • Crane Facility i.e., EOT Cranes
  • Rubber Moulding
    • A. 5 TONS
    • B. 10 TONS
  • Weighing Scale

RUBBER CURING DIVISION

  • Vulcanizer (Big):- 12 Ft. Dia X 20 Ft. Length
  • Vulcanizer (Small):- 6 Ft. Dia X 20 Ft. Length
  • Steam Boilers
  • Grinding machine(lathe):- 0.35m Dia. X 7.5 Mtr. Length

LAB FACILIITIES

  • Adhesion Test Apparatus
  • Tensile Tester
  • Spark Tester
  • Hardness Meter – shore "A" & "D"
  • Thickness tester

FINISHING EQUIPMENTS

  • Slandering Machine 7" - 6 No's-for finishing the Rubber Lined equipments.
  • Slandering Machine 4" – 5 No's for finishing the Rubber Lined equipments.
  • Hand Drilling Machine – 5 No's to drill the FLANGE Holes.

RUBBER MOULDIND EQUIPMENTS

  • Hydraulic Press
  • Hand Press
  • Rubber Moulds